Ear Irrigation Model

The DM-NS6050 Ear Irrigation Model demonstrates the standard position for ear irrigation and lets trainees rehearse the procedure safely, away from any risk of flushing a patient directly. The learner practises the full sequence: seating the patient with the head slightly to the side, ear angled upward, a sterile towel or rubber blanket over the neck and shoulder, and the curved plate held close to the earlobe to catch the returning water. The operator pulls the auricle up and back with the left hand to straighten the external auditory canal, then uses the irrigator in the right hand to direct the stream at the posterior upper wall. After rinsing, the canal is dried with a cotton swab and checked for damage or disease.

Key Features

Position Teaching

Position Teaching

The model holds the standard irrigation posture so positioning can be demonstrated clearly.

Safe by Design

Safe by Design

Lets trainees build flushing control without any risk of direct harm to a patient.

Anatomical Direction

Reinforces aiming the stream at the posterior upper wall of the external auditory canal.

Complete Sequence

Covers auricle traction, curved-plate handling, irrigation and post-rinse drying.

Scroll to Top